-
Save Search
You must log in to do that.
-
Share Search
-
Download Search
The download will only include records from the current search page. You can increase the number of records to download by changing the number of 'listings per page' at the bottom of this page. Note that the maximum number of records that can be listed per page is 300. The download may exceed the number of records listed as any 'nested' records that have met the search criteria will also download.
Download file (.xls)
Success
Error
-
Save Search
You must log in to do that.
-
Share Search
-
Download Search
The download will only include records from the current search page. You can increase the number of records to download by changing the number of 'listings per page' at the bottom of this page. Note that the maximum number of records that can be listed per page is 300. The download may exceed the number of records listed as any 'nested' records that have met the search criteria will also download.
Download file (.xls)
-
Scott Street extension CAVENDISH, Southern Grampians Shire
Southern Grampians Shire
The timber trestle Railway Bridge over the Wannon River was constructed between 1918-1920 to link the Hamilton and Balmoral lines. The bridge used conventional trestle construction and is…
-
Mt Napier Road HAMILTON, Southern Grampians Shire
Southern Grampians Shire
SIGNIFICANCE: »One of the few remaining industrial buildings and akey element in the railway complex. STATEMENT OF SIGNIFICANCE Permewan Wright Sheds Mount Napier Road The Permewan Wright…