Berry United Gold Mining Co Mine & Machinery Site
SMEATON VIC 3364 - Property No B6003
Berry United Gold Mining Co Mine & Machinery Site
SMEATON VIC 3364 - Property No B6003
All information on this page is maintained by National Trust.
Click below for their website and contact details.
National Trust
-
Add to tour
You must log in to do that.
-
Share
-
Shortlist place
You must log in to do that.
- Download report
On this page:
Statement of Significance
This was one of the last mines to be opened on the lead system. The plant was installed and operational by 1903 and consisted of 2 compound condensing steam engines (one of 275 horsepower) driving 22 inch pumps. In 1906 it was discharging 6 million gallons per day and this made it the most powerfull plant in the area. Winding and puddling plant were installed in 1908.
The site provides evidence of the level of technological sophistication in deep lead mining towards the end of this particular phase of mining.
Classified: 22/08/1988
The site provides evidence of the level of technological sophistication in deep lead mining towards the end of this particular phase of mining.
Classified: 22/08/1988