Statement of Significance
This site is of social significance for the local community as part of their former recreational landscape.
-
-
FORMER PARKSIDE SWIMMING POOL - History
The swimming pool was built sometime around the late 1930s early 1940s (G138), but were demolished sometime after 1960 (G165). The pool consisted of a semi- enclosed U shaped pier, which partially curved back towards shore. Anderson and Mills both recall that the structure led out from the end of the path down from Hearne Drive to the foreshore, and was a popular attraction during their youth (c 1950s/60s).
FORMER PARKSIDE SWIMMING POOL - Interpretation of Site
A promenade from the Eastern Beach baths terminates at a knuckle in the seawall (Eastern Beach Seawall # 5) at the former root of the previous Swimming Pool Pier. From this point northwards, there is a pronounced change in seawall fabric and construction technique (Eastern Beach Seawall #6), and it is suggested that seawall # 5 was purpose built and/or and alteration to the existing seawall to act as a promenade from the Eastern Beach Baths. A 2m long single tier bluestone block groyne wall (with concrete attached to its side) probably marks the former access way to the pier. The groyne has been partially destroyed by storms and the blocks are scattered along the beach south of this location. Approx 60 and 100m to the north east along the foreshore lie two horizontal concrete piles. The piles appear to have been recycled from either a pier (or other in water structure), and have evidence of former iron shoes and rebate and/or lugs for attaching platform structures to them. The piles appear to have been used as vernacular groynes, probably in an attempt to encourage sand accretion along the foreshore as a beach for the swimming pool patrons (which on examination of a very rocky foreshore seem to have failed). The piles are not cemented into the seawall, further suggesting that they postdate Seawall #6. Anderson and Mills have reported remnants of structural components underwater offshore.
Heritage Study and Grading
Heritage Victoria - Maritime Infrastructure Assessment Project
Author: Heritage Victoria
Year: 2005
Grading:
-
-
-
-
-
FIRST CUSTOMS HOUSEVictorian Heritage Register H0185
-
CORIO VILLAVictorian Heritage Register H0193
-
MERCHISTON HALLVictorian Heritage Register H0192
-
-