NINE MILE COMPANY GOLD MINE
NINE MILE MINE ROAD NINE MILE, LODDON SHIRE
-
Add to tour
You must log in to do that.
-
Share
-
Shortlist place
You must log in to do that.
- Download report
Statement of Significance
The Nine Mile Company Gold Mine consists of sets of engine and battery foundations, a small powder magazine, water dam and a tailings heap. These are remnants of quartz mining carried on at the site between 1899 and 1912. The company was not a large gold producer (only 18,000 ounces of gold) but the mine site has retained a range of relics including a set of large well preserved timber horses.
The Nine Mile Company Gold Mine is of historical, archaeological and scientific importance to the State of Victoria.
The Nine Mile Company Gold Mine is historically and scientifically important as a characteristic example of an important form of gold mining. Gold mining sites are of crucial importance for the pivotal role they have played since 1851 in the development of Victoria. As well as being a significant producer of Victoria's nineteenth century wealth, quartz mining, with its intensive use of machinery, played an important role in the development of Victorian manufacturing industry. The Nine Mile Company Gold Mine is important because of the range of relics that survive from mining operations that took place at the turn of the century.
The Nine Mile Company Gold Mine is archaeologically important for its potential to yield artefacts and evidence which will be able to provide significant information about the technological history of gold mining.
-
-
NINE MILE COMPANY GOLD MINE - Permit Exemptions
General Exemptions:General exemptions apply to all places and objects included in the Victorian Heritage Register (VHR). General exemptions have been designed to allow everyday activities, maintenance and changes to your property, which don’t harm its cultural heritage significance, to proceed without the need to obtain approvals under the Heritage Act 2017.Places of worship: In some circumstances, you can alter a place of worship to accommodate religious practices without a permit, but you must notify the Executive Director of Heritage Victoria before you start the works or activities at least 20 business days before the works or activities are to commence.Subdivision/consolidation: Permit exemptions exist for some subdivisions and consolidations. If the subdivision or consolidation is in accordance with a planning permit granted under Part 4 of the Planning and Environment Act 1987 and the application for the planning permit was referred to the Executive Director of Heritage Victoria as a determining referral authority, a permit is not required.Specific exemptions may also apply to your registered place or object. If applicable, these are listed below. Specific exemptions are tailored to the conservation and management needs of an individual registered place or object and set out works and activities that are exempt from the requirements of a permit. Specific exemptions prevail if they conflict with general exemptions. Find out more about heritage permit exemptions here.Specific Exemptions:EXEMPTIONS FROM PERMITS:
(Classes of works or activities which may be undertaken without a permit under
Part 4 of the Heritage Act 1995)
No permits are required for the following classes of works provided they are
carried out in accordance with the provisions of the Conservation-Management
Plan For Historic Mining Sites prepared by David Bannear in 1996.
* Mineral Exploration
* Fire suppression duties
* Timber production
* Weed and vermin control
* Public safety
* Rehabilitation
-
-
-
-
-
NINE MILE COMPANY GOLD MINEVictorian Heritage Register H1237
-
NINE MILE COMPANYVictorian Heritage Inventory
-
'Boonderoo', House and OutbuildingsGreater Bendigo City
-
'Riverslea' houseGreater Bendigo City
-
1 Adam StreetYarra City
-
-